This week’s weather continues to run nearly 20 degrees above normal, bringing a true taste of spring with each passing day. The warm temperatures have encouraged early green-up of tees and fairways, though we still have some time before fully entering the active growing season.
On Monday, the greens were lightly sand topdressed and fertilized to manage early growth and support recovery from traffic and ball marks. As a result, green speeds may be temporarily a bit slower over the next week.
Throughout the week, we planted four truckloads of sod, focusing primarily on the right side of #6 Gold and on holes #4 and #5 Blue. In conjunction with this work, six new sprinkler heads are being installed to improve irrigation coverage, promote healthier turf, and help minimize erosion over time.
We are also actively addressing the sewer odor in the #5 Blue restroom. The source has been challenging to pinpoint for both DAC staff and a professional plumber, but additional corrective steps were taken this week, and we are hopeful the issue will soon be resolved.
Next week, sod installation will continue, shifting focus to areas around the tennis facility, the parking lot, and select bunker faces. The forecast looks outstanding heading into the weekend, and we look forward to seeing everyone enjoying the courses.
